Process Standardization
StandardiziT — create & approve standard processes
From step structure to translations and approvals: one flow to create, update, and publish work standards.
- Steps & WES substeps with VA/NVA/Walk times
- Product options/variants with safe constraints
- Media: images, videos, layout diagrams + documents
- PPE/equipment, parts and assemblies at step or WES level
- Approvals and auto-reset on edits
- Processes and Line Planning feed Yamazumi balancing
- Losses recalc net time — Yamazumi highlights overloads
- Raise Problem / Improvement Idea directly from Yamazumi
Simple, standardised & scalable
What StandardiziT includes
Authoring: steps & WES substeps
Structure your process: steps and WES substeps with time (VA/NVA/Walk). When a step is renamed, WES numbering updates automatically.
Options / variants
Link options to product variants. Deletion is protected: if an option is used in takt-time configuration, deletion is blocked.
PPE & Equipment
Associate PPE and equipment with steps and WES substeps. Bulk add/remove and update links in one click.
Media & documents
Images, videos, layout diagrams and supporting documents (S3). Smart, collision-safe file names.
Key Points (SQK) & reasons
Key Points with types/codes and reasons — on steps and WES substeps. Flexible edit and delete.
Approval
Two-party approvals (creator/approver).
Line Planning
Set takt target, crew size, shift pattern, and planned output. These parameters directly feed Yamazumi balancing to keep each station under takt.
Losses & availability
Model planned/unplanned losses (changeovers, microstops, meetings). Net available time is recalculated and Yamazumi bars update instantly, highlighting overloads after losses.
Raise Problem
Spin off an issue discovered during Yamazumi balancing into a Problem case with its own ID, assignee and follow-up tracking.
Improvement Idea
Capture an idea on the fly while working in Yamazumi balancing; keep full context and convert into actions later.
Outcomes with StandardiziT
Indicative results from customer rollouts; actual impact depends on baseline, process complexity, and adoption maturity.
−30%
Time to update standards
100%
Version traceability
×2.0
Approval throughput